Live Production Dashboard

Real-time overview of manufacturing operations

Total Production Today

247
↑ 12% from yesterday

Active Work Orders

18
5 in progress

Machine Efficiency (OEE)

87%
↑ 3% this week

Inventory Value

₹45.2L
1,247 items in stock

Production vs Target (Last 7 Days)

Machine Utilization

Inventory Ageing Analysis

CAD Drawing Management

Manage engineering drawings and version control

Drawing No Product Name Version Status Last Updated Actions
DRW-001 Stainless Steel Panel v2.3 Approved 2026-07-12
DRW-002 CNC Bracket Assembly v1.5 Pending 2026-07-10
DRW-003 Welded Frame Structure v3.1 Approved 2026-07-08

Bill of Materials

Multi-level BOM management and cost calculation

BOM Code Product Level Components Total Cost Status
BOM-001 SS Panel Assembly 3 12 items ₹8,450 Active
BOM-002 CNC Machine Base 4 28 items ₹45,200 Active
BOM-003 Welded Frame 2 8 items ₹3,800 Completed

BOM Cost Breakdown

Material Requirement Planning

Automatic material planning and shortage analysis

Materials Required

156
For next 7 days

In Stock

132
85% availability

Shortage Items

24
Need to order
Material Code Description Required In Stock Shortage Status
RM-001 SS 304 Sheet 2mm 50 45 5 Shortage
RM-002 MS Pipe 50mm 30 35 0 Available
RM-003 Welding Rod 3.15mm 100 80 20 Shortage

Production Planning & Control

Schedule and track production activities

Order ID Product Quantity Start Date End Date Progress Status
PO-001 SS Panel Assembly 50 2026-07-10 2026-07-15
75%
In Progress
PO-002 CNC Bracket 100 2026-07-12 2026-07-18
40%
In Progress
PO-003 Welded Frame 25 2026-07-08 2026-07-13
100%
Completed

Work Order Management

Manage work orders and job cards

WO Number Product Operation Machine Operator Status
WO-001 SS Panel Laser Cutting CNC Laser #2 Rajesh Kumar Running
WO-002 CNC Bracket Bending Press Brake #1 Suresh Patel Queued
WO-003 Welded Frame TIG Welding Welding Station #3 Mahesh Singh Completed

Machine Management

Track machine utilization and maintenance

Total Machines

24
All operational

Avg Utilization

82%
↑ 5% this month

Downtime

4.2 hrs
Last 24 hours
Machine ID Type Status Utilization Last Maintenance Next Service
MC-001 CNC Laser Cutting Running 89% 2026-07-01 2026-08-01
MC-002 Press Brake Running 76% 2026-06-28 2026-07-28
MC-003 TIG Welding Maintenance 0% 2026-07-14 2026-08-14
MC-004 CNC Milling Running 92% 2026-07-05 2026-08-05

Machine Efficiency (OEE)

Inventory Management

Track raw materials, WIP, and finished goods

Raw Materials
WIP
Finished Goods
Scrap
Material Code Description Size/Spec Quantity Unit Location Heat No
RM-001 SS 304 Sheet 2mm x 1220 x 2440 45 Sheets A-01-03 H2026-045
RM-002 MS Pipe 50mm NB 35 Meters B-02-01 H2026-032
RM-003 SS Plate 6mm x 1250 x 2500 28 Plates A-02-02 H2026-051
WIP Code Product Stage Quantity WO Ref
WIP-001 SS Panel - Cut Laser Cutting 38 WO-001
WIP-002 Bracket - Bent Bending 40 WO-002
FG Code Product Name Quantity Batch No Location
FG-001 SS Panel Assembly 25 B2026-078 FG-A-01
FG-002 Welded Frame 15 B2026-079 FG-A-02
Scrap Code Material Type Quantity Weight (kg) Date
SC-001 SS Offcuts 12 85 2026-07-13
SC-002 MS Scraps 8 120 2026-07-12

Warehouse Management

Bin location tracking and stock management

Total Locations

156
Across 4 warehouses

Occupied

124
80% utilization

Available

32
Ready for stock
Location Code Warehouse Aisle Rack Bin Capacity Status
A-01-01 Raw Material Aisle 1 Rack 1 Bin 1 100 sheets Occupied
A-01-02 Raw Material Aisle 1 Rack 1 Bin 2 100 sheets Occupied
B-02-01 Pipe Storage Aisle 2 Rack 2 Bin 1 50 meters Occupied

Quality Control

Inspection management and quality tracking

Inspections Today

12
All passed

Rejection Rate

2.3%
↓ 0.5% this week

Open CAPA

3
In progress
Inspection ID Product Type Inspector Result Date
QC-001 SS Panel Final Inspection Amit Sharma Passed 2026-07-14
QC-002 CNC Bracket In-Process Vijay Kumar Passed 2026-07-14
QC-003 Raw Material Incoming Rakesh Patel Pending 2026-07-14

Quality Metrics

Production Costing

Track and analyze production costs

Total Material Cost

₹12.5L
This month

Labor Cost

₹3.8L
This month

Overhead Cost

₹2.1L
This month

Total Production Cost

₹18.4L
This month
Product Material Cost Labor Cost Machine Cost Overhead Total Cost Profit Margin
SS Panel Assembly ₹8,450 ₹1,200 ₹850 ₹450 ₹10,950 22%
CNC Bracket ₹2,800 ₹650 ₹420 ₹230 ₹4,100 18%
Welded Frame ₹3,800 ₹950 ₹680 ₹370 ₹5,800 25%

Cost Breakdown Analysis

Purchase Management

Manage vendors and purchase orders

PO Number Vendor Material Quantity Amount Delivery Date Status
PO-2026-001 Steel Corporation Ltd SS 304 Sheet 100 sheets ₹2,45,000 2026-07-18 Pending
PO-2026-002 Metal Traders MS Pipe 200 meters ₹1,80,000 2026-07-16 Received
PO-2026-003 Welding Supplies Co Welding Rods 500 kg ₹75,000 2026-07-20 Pending

Sales & Dispatch

Manage sales orders and dispatch planning

Sales This Month

₹45.8L
↑ 15% vs last month

Pending Orders

8
Value: ₹12.5L

Dispatched Today

5
All on time
SO Number Customer Product Quantity Amount Delivery Date Status
SO-2026-001 ABC Industries SS Panel Assembly 50 units ₹6,75,000 2026-07-20 In Production
SO-2026-002 XYZ Manufacturing CNC Bracket 200 units ₹9,80,000 2026-07-25 Pending
SO-2026-003 DEF Engineering Welded Frame 30 units ₹2,61,000 2026-07-15 Dispatched

Sales Performance

Accounts & Finance

Financial management and reporting

Receivables

₹28.5L
15 invoices pending

Payables

₹18.2L
8 bills to pay

Cash in Hand

₹3.5L
Updated today

Bank Balance

₹42.8L
As of today
Receivables
Payables
Invoices
Invoice No Customer Amount Due Date Days Overdue Status
INV-001 ABC Industries ₹6,75,000 2026-07-20 0 Pending
INV-002 XYZ Manufacturing ₹4,50,000 2026-07-10 4 Overdue
Bill No Vendor Amount Due Date Status
BILL-001 Steel Corporation Ltd ₹2,45,000 2026-07-18 Pending
BILL-002 Metal Traders ₹1,80,000 2026-07-16 Paid
Invoice No Date Customer Amount GST Total
GST-2026-001 2026-07-14 ABC Industries ₹5,72,034 ₹1,02,966 ₹6,75,000
GST-2026-002 2026-07-13 DEF Engineering ₹2,21,186 ₹39,814 ₹2,61,000

Financial Overview

MIS Reports

Comprehensive business intelligence and analytics

Production Efficiency

87%
↑ 3% this month

On-Time Delivery

94%
Industry leading

Quality Score

98.5%
First pass yield

Customer Satisfaction

4.8/5
Based on 120 reviews

Monthly Performance Trends

Profit Analysis